Managing Electric Vehicle Grid Integration Projects

Develop the judgement and the documentation needed to run electric vehicle grid integration properly.

📍 Istanbul🗓️ 5 training days📚 4 modules🎓 Accredited certificate
5intensive training days
4scientific modules
8training sessions
32detailed points

Course Overview

Regulators and insurers increasingly want documented evidence of how electric vehicle grid integration is controlled. Assets involved in grid integration routinely outlive the engineers who commissioned them. The programme suits teams tackling the wider energy and hydrocarbon operations agenda together as readily as individuals attending alone. Practitioner evidence points the same way: electric vehicle grid integration improves fastest where responsibility for it is named and owned. They gain the ability to sequence improvements to this aspect of energy and hydrocarbon operations in an order their organisation can absorb. It concentrates on the parts of grid integration that determine outcomes and treats the rest proportionately. The method assumes participants will be challenged on their handling of electric vehicle grid integration and prepares them for it. Most organisations already have a policy on grid integration; far fewer can show it working. The programme closes with an action plan for the wider energy and hydrocarbon operations agenda that each participant writes for their own organisation.

Expected Learning Outcomes

01

Apply a repeatable review cycle to electric vehicle grid integration and act on what it produces.

02

Specify the instrumentation and data needed to monitor grid integration reliably.

03

Prepare the technical case for capital investment in electric vehicle grid integration.

04

Translate policy on grid integration into procedures that hold up under day-to-day pressure.

05

Establish spare-parts and logistics cover for the critical elements of electric vehicle grid integration.

06

Verify that contractors working on grid integration meet the same standard as direct staff.

07

Assess the current state of electric vehicle grid integration against a structured set of criteria rather than impressions.

Who Should Attend

01

Facility and plant managers accountable for electric vehicle grid integration.

02

Analysts producing the data on which decisions about grid integration rest.

03

Team leaders and supervisors who put electric vehicle grid integration into practice day to day.

04

Shift supervisors and control room leads dealing with grid integration in real time.

05

Graduate and newly assigned engineers taking responsibility for electric vehicle grid integration.

06

Consultants and service company personnel supporting clients on grid integration.

Course Modules

01

Electric vehicle grid integration: integrity, inspection and condition assessment

2 sessions · 8 points

Session 1Competence and handover on electric vehicle grid integration when experienced staff leave

  • Check that management of change is applied to every modification of electric vehicle grid integration.
  • Assess the emissions and discharge attributable to grid integration.
  • Identify critical spares for electric vehicle grid integration and confirm lead times.
  • Set escalation thresholds for grid integration that work out of hours.

Session 2The hard cases in grid integration and how to reason about them

  • Establish the alarm philosophy applying to electric vehicle grid integration and remove nuisance alarms.
  • Verify isolation points for grid integration are proven and documented.
  • Identify the data already collected that bears on electric vehicle grid integration.
  • Set the trigger for a life-extension versus replacement study on grid integration.
02

Grid integration: environmental obligation and emissions

2 sessions · 8 points

Session 1Building the investment case for grid integration that finance will accept

  • Arrange the handover of electric vehicle grid integration so capability survives staff changes.
  • Agree what will be standardised in grid integration and what will not.
  • Confirm contractor competence records for anyone working on electric vehicle grid integration.
  • Identify the failure modes of grid integration with the highest consequence.

Session 2The permit and isolation regime that grid integration actually requires

  • Record what was learned when electric vehicle grid integration did not go as planned.
  • Name a single owner for each element of grid integration.
  • Anticipate the objections electric vehicle grid integration will raise and prepare the answers.
  • Plan the grid integration scope so it fits the available shutdown window.
03

Grid integration: economics, price exposure and investment case

2 sessions · 8 points

Session 1Comparing grid integration with recognised practice

  • Verify emergency response arrangements cover the scenarios electric vehicle grid integration can create.
  • Estimate the resource grid integration requires to run as designed.
  • Prepare the summary of electric vehicle grid integration that senior management will read.
  • Confirm the inspection interval for grid integration is based on condition, not habit.

Session 2Keeping electric vehicle grid integration alive after the initial push

  • Record the technical rationale for the chosen approach to electric vehicle grid integration.
  • Build the internal briefing that explains grid integration to those affected.
  • Check that electric vehicle grid integration still works when volumes rise unexpectedly.
  • Confirm that lessons from grid integration are shared beyond the team that learned them.
04

Grid integration: incidents, lessons and continual improvement

2 sessions · 8 points

Session 1Deciding between life extension and replacement for grid integration

  • Confirm that reporting on electric vehicle grid integration reaches the people who can act.
  • Benchmark the organisation's grid integration against comparable operations.
  • Close out actions on electric vehicle grid integration rather than leaving them open indefinitely.
  • Collect evidence on the present handling of grid integration before proposing changes.

Session 2The environmental exposure created by grid integration

  • Distinguish symptoms from causes when electric vehicle grid integration underperforms.
  • Define the safe operating envelope for grid integration and how deviations are detected.
  • Model the economics of electric vehicle grid integration at low, base and high price cases.
  • Confirm handover documentation for grid integration is complete and current.

Choose the package that suits you

Silver Package

At least 3 people

USD1,250
  • Workshop or Program Participation
  • Airport Transfers
  • Customized Badge
  • Expert Mentorship (Private Sessions)
  • Supervision & Secretarial Services
  • Accredited Certificate of Participation
  • Complete Training Kit
  • Coffee Break
  • Closing Ceremony

Gold Package

At least 3 people

USD1,850
  • 5-night stay in a 5-star hotel
  • Workshop or Program Participation
  • Airport Transfers
  • Customized Badge
  • Expert Mentorship (Private Sessions)
  • Supervision & Secretarial Services
  • Accredited Certificate of Participation
  • Complete Training Kit
  • Coffee Break
  • Closing Ceremony

Complete your registration

We will contact you within one business day to confirm.